Georgia Power (GP) announced July 27, it recently completed one of the company’s first battery energy storage systems (BESS) connected to solar.
The Moody Battery Facility, near Valdosta, is capable of 49.5 megawatts (MW) of battery storage, which can be deployed back to the grid over a fourhour period. This flexible energy storage system matches the output of the nearby Moody solar facility and ad…